When the Airbus A380 entered service with Singapore Airlines in October 2007, it ushered in a new era for the world's airlines of the ultra-large airliner.For Airbus it was crucial that when the revolutionary aircraft made the headlines during its debut - as it inevitably would - it was not for the wrong reasons. After the programme suffered lengthy production delays that resulted in the assembly process having to be reinvented, there were sceptics waiting to see if the double-decker would fall on its face when it began earning money.
HIGH LOAD FACTORS
All the operators echo Clark's view that the A380 has proved massively popular with passengers, evidenced by the fact that their fleets consistently fly at high load factors. But Clark points out that the downside of this is that "lose one, and you're in trouble".The operators put the A380's passenger appeal down to a combination of the quiet and spacious cabins, high standard of in-flight entertainment and the giant's comfortable ride. "She goes through turbulence like a huge Queen Mary 2 on the North Atlantic in January," says Clark.
While Emirates was not the first to receive the aircraft, it is the biggest customer, with an order for 58 Engine Alliance GP7200-powered aircraft. It received its first 489-seater in July 2008 - a date that like fellow customers was subject to a series of reschedulings that pushed back its first delivery by more than two years from the original plan agreed at the time of the order.
The carrier now has five A380s in service and 10 more (with capacity increased to 517 seats through the deletion of the maindeck crew rest compartment) are due to be delivered by the summer of next year. "After that we have dates that remain fluid," says Clark.
SIA IN THE VANGUARD
Nine months before the first Emirates delivery, it was SIA that led the way as launch operator, taking its first of 19 Rolls-Royce Trent 900-powered A380s on 15 October 2007 and putting the 471-seater into service 10 days later between Singapore and Sydney.
"The first three months went almost flawlessly. We were breaking new ground everywhere. It was something everyone in SIA felt so proud of," says the airline's senior vice-president flight operations Capt Gerard Yeap.
He concedes that the 10 months between certification and first deliveries gave all stakeholders breathing space to get on top of all the major issues. "When the aircraft was delayed we took the opportunity to work with Airbus and the OEMs to see what we could fix before service entry.
Sirisena points out that with the A380 being a "showcase, there has always been a very strong support presence from Airbus, although it has been scaled back from the 'meet-and-greet' level when it first went into service".John Vincent, who was Qantas's acting executive manager engineering at the time of the interview, concurs on the airframer's contribution. "Airbus has provided, and continues to provide, a high level of support at all destination ports across our A380 network. Airbus specialists are on hand for all arrivals and departures and there is a substantial presence in Sydney, where the maintenance operation is based," he says.
TECHNICAL ASSISTANCE
"In conjunction with the various modification packages, Airbus and its suppliers continue to provide additional spare parts to facilitate parts update and upgrade. Technical data assistance has been of a high standard."Vincent gives as an example the help Airbus provided to Qantas with the commissioning of the electronic log book. "A specialist was located in Sydney for several months that had access to the design and support functions in Toulouse," he says.
Technical Issues
As the A380 in-service fleet has expanded, problems have come to light. To address known problems, as well as the in-service issues, the fleets are undergoing major modification programmes at timed intervals.
The first notable issue that SIA faced occurred around three months in, just after the second aircraft arrived, when a fault surfaced with the alternate brake system in Sydney. However, Sirisena says that "compared with the early days of the A340-300 or 777, the problems have not been that significant".Clark says that the Emirates fleet is undergoing "a big mod programme that requires removing an aircraft from service". This should be completed on the five delivered aircraft by February.
Sirisena says: "What we are grappling with are algorithms for failure detection, which not only detects a failure but also acts upon it. Unfortunately this can lead to a perfectly healthy system being shut downor [a no-go fault warning] for a problem that was minor enough to have been deferred."Once we identify a problem and understand it, Airbus will quickly come up with a work-around. But it is not so straightforward to reprogram."
NUISANCE WARNINGS
Clark says that the problem with the nuisance warnings has been their diverse nature, but "the common thread" is the software. He says Airbus executive vice-president programmes Tom Williams and his team "have sat in my office many times and said they can't identify trends, which is the worst possible thing".
Issues included a fuel tank indication system problem that affected two aircraft and a nose wheel steering issue on one, he says.
Airbus's Williams says that this latter problem was caused by water ingress into the rotary transducer on the gear leg that identifies its position. "The water was freezing on long flights, which was causing the sensor to give inaccurate positioning. There's been a design change and in the meantime an inspection procedure has been implemented."
Strambi says that the Qantas A380 fleet's dispatch reliability has been "good". A small number of technical issues had an impact on operations for a short period, but generally "we have been happy with the aircraft's reliability, considering this is the first 12 months of operating a brand-new fleet type".Clark says that while the Emirates fleet has also suffered some "hugely frustrating" failures of components, most are easily dealt with. However, one "pain" has been the repeated failure of the main gear steering system, which can force the aircraft to return to the stand as the steering is a minimum equipment list (MEL) item.
Sirisena explains that the problem has occurred due to "wear and tear issues that surfaced after flight-test" and that Airbus devised an interim "work-around" - to taxi straight for 50m (165ft) before making a turn.
HAPPIER TALE
A happier tale is the A380's performance, which has bettered expectations. "Meeting the performance guarantees doesn't come into it, she's ahead of her nominals," says Clark."The faster the A380 flies the less fuel it burns. Long-range cruise is Mach 0.85, if you fly at Mach 0.83 the fuel burn increases."Qantas's Strambi concurs: "The A380 has met or exceeded all the original performance, noise and fuel burn guarantees made by Airbus at the time the aircraft purchase decision was made."Clark says that because of the "favourable mach bias, there's quite a marked increase in terms in fuel reduction as you increase the cruise speed to Mach 0.85".
Emirates' GP7200s have also behaved well during their first year in service, showing what Clark believes is an unprecedented "zero degradation" in performance. The airline has had two precautionary in-flight shutdowns, but neither was caused by the machinery, says Clark. "They were indication issues."
SIA has suffered three in-flight shutdowns, one of which was caused by fuel starvation and one by a quality/installation problem that caused an oil line to crack. The third incident, which occurred in September, was a precautionary shutdown after the crew received a warning and is still under investigation.
MAINTENANCE INSPECTION
Meanwhile, SIA's oldest A380 (MSN003/9V-SKA) underwent the first C check maintenance inspection in September, having accumulated more than 8,000h and 1,000 cycles. The inspection, which has a two-year interval, was undertaken at the airline's Changi base with a "small army of Airbus people in attendance - about 100 folks", says Williams."We did some deeper inspections than we'd normally do in a C check and discovered some small things for us to follow up, but there were no major issues," he adds.
"When you fly with a full passenger load there are different vibratory stresses than during flight-testing. Once an aircraft is in the air things flex, twist and turn, alignments are different and there are vibrations, stresses."
This phenomenon has already seen some "transitory vibrations" identified in the plumbing for the A380's 345bar (5,000lb/in2) hydraulic system, Sirisena says. "We've seen some strange movement in the plumbing."However, Williams says that Airbus "has not seen vibration as being an issue that has come up".
Pilot's perspective
SIA's flight operations chief Capt Yeap says that SIA operates its A380s with ratio of around 10 to 11 flightcrews per aircraft. He says that pilots have "transitioned easily" to the aircraft's size as many were already familiar with 747-400. Transition time is about three months, the same for other types in the fleet, he adds."Crews are very happy after their first circuit. The A380 is a well-designed aeroplane, the flight-control laws are very advanced and it is responsive for its size and accurate to fly," Yeap says.
On the ground, the A380 manoeuvres like the 747 - "a gentle oversteer", he says. "The major difference is the inertia. The steering is fly-by-wire, so it is not an instinctive input like normal direct controls and takes a little bit of getting used to."Normal procedure is to use the taxi camera, "but with experience, any competent crew will be able to taxi without it", adds Yeap.The A380 has impressive performance once off the ground - "we can achieve optimum climbs with no problem" and it also slows down well, he adds.
All the airports that the type serves have been well prepared for the aircraft. "With air bridges to main and upper deck passenger enplaning and deplaning is poetry in motion," says Clark. Turnaround times range from 90-110min, depending on route and operator. For example, Emirates does 90min turns at London Heathrow between the inbound EK001 and outbound EK002, says Clark. And replenishing main and upper deck galleys using standard and special scissor-lift trucks has not been problematic. "We've never had to use the cart lifts," he adds.
Looking forward
Clark says that as its A380 fleet grows next year, new destinations for the type are likely to include Paris and Seoul and he wants to return to New York - where it inaugurated its A380 operations in 2008 - by June. Tokyo Narita is also a potential future destination.While there are planned dates for new A380 routes, Clark concedes that these are contingent on Airbus meeting the delivery schedule. "We still have some niggling delays from Toulouse - they're still not stable on the production side."
"We put 2.5t in the aircraft, but we're only using 60% - even with every first-class passenger taking a shower - so we've reduced the potable water we carry," Clark adds.Because of weight growth during development, initial production A380s are around 5-6t behind the target manufacturer's weight empty (MWE) says Clark.
WEIGHT REDUCTIONS
He forecasts that A380s being delivered by 2012 will have MWEs "a minimum of 2t lighter" than today's aircraft, which, combined with reductions in the weight of the airline's operator items (a new generation of lighter seats, for example) means "you've got an aircraft that can fly 15h 45min and can do the West Coast".
Manufacturer's view
Airbus acknowledges that it has "still got work to do" to get the A380's reliability to match the level of the passenger appeal it has delivered during its first two years in service."Keeping in mind the level of technology that we've brought to the aircraft, it's been encouraging to see the level of performance that we've got - but we can do better," says Airbus executive vice-president programmes, Tom Williams. "We've still got some work to do."When the A380 entered service two years ago with Singapore Airlines, Airbus laid on an extremely intense network of "enhanced support", positioning additional engineers, mechanics and personnel from Toulouse into Singapore and the first outstation, Sydney.
Williams concedes that Airbus was "disappointed" and surprised about problems that began to crop up after a strong first few months of operation, given the preparations it had made. "We used the extended time between certification and delivery to do a lot of extra flying work on maturity. But we still encountered things when we went into service that hadn't shown up before."Why? Because there are a different set of pressures during testing to what an airline experiences.
Williams shares Emirates Airline president Tim Clark's doubts about any early success in the fleet reaching the 98.5% TDR target. "I think we're closing on it pretty fast, but not by the end of this year. I'd be confident we'd be there by the middle of next year. We've still got a bit of work to do."The spurious error-message woes have been further heightened by issues with sensors in certain parts of the aircraft, such as the nose-gear and body-gear steering systems, and fuel quantity management system.
Engine makers' views
As lead engine supplier on the A380, Rolls-Royce's 70,000lb thrust (312kN) Trent 900 powered the aircraft on its maiden sortie on 27 April 2005 and the bulk of the test fleet during the flight trials and certification programme. The Trent has been selected for nine of the 16 customers so far and is used by two of the three airlines operating the type - Singapore Airlines and Qantas - which account for 14 of the 20 aircraft delivered.R-R's rival on the A380 - General Electric and Pratt & Whitney's Engine Alliance joint venture - could be described as a "one-trick pony" because the double-decker is the only application for its single product, the 70,000lb-thrust GP7200.
Emirates president Tim Clark says the engines powering his A380s have performed well and had no major issues.Engine Alliance president Jim Moravecek says that the GP7200's fuel burn came in 0.9% ahead of Airbus's specification, which gives it a 1% advantage over its rival.R-R's Keen disputes this claim, but the engine maker is working on a two-pronged development programme for the A380's Trent, the first of which, the 900EP, has been launched and is available from 2012.